Don't Have an Account? Sign Up to Save Favorite Listings, Save Searches & More...
Brand new Maronda Homes Miramar A4 plan with estimated completion date of November 2024. CBS construction with full builder warranties. Terrific planfeaturing stone accented front elevation, large great room, 9'4'' volume ceilings, solid surface tops in kitchen, extensive ceramic tile flooring, refrigerator, blinds, lanai andmuch, much more.
Listing information last updated on May 4th, 2024 at 12:45pm EDT.
All listings featuring the BMLS logo are provided by BeachesMLS, Inc. This information is not verified for authenticity or accuracy and is not guaranteed. Copyright © 2024 BeachesMLS, Inc.